Welcome to Zhejiang YideK Co., Ltd. website!
Success case
FAW forging workshop compensation cabinet case
FAW forging workshop compensation cabinet case2018-07-28

Renovation location: FAW forging workshop low-voltage power distribution Renovation unit: Zhejiang Yide Technology Co., Ltd. ?? ??? Transformer: 5600KVA ??? Original power factor: around 0.7, target: above 0.95 ??? Load: 3 intermediate frequency furnaces ??? Power: 3 intermediate frequency furnace power is 90KW

Metallurgical industry and welding industry
Metallurgical industry and welding industry2018-07-28

Recently, the YD-8CKH controller produced by the company has passed the “CQC” certification of China's national compulsory product, and recently obtained the “CQC” certificate and the approval for the use of the mark.

Governance three-phase unbalanced transformation project
Governance three-phase unbalanced transformation project2018-07-28

The transformer capacity is 100KVA, the transformer is changed, and the load is mainly used by residents. This equipment mainly solves the three-phase load imbalance, and also solves the reactive power compensation, the bidirectional fast adjustment of reactive power, and the stable system voltage in real time.

SPC Tangshan City Fengnan District Public Change - Site 2
SPC Tangshan City Fengnan District Public Change - Site 22018-07-28

The transformer is a public transformer with a capacity of 315KVA. The load is mainly for residential electricity, single-phase load such as lighting, air conditioning, heating, etc., and there is a long-term three-phase load imbalance.

Help
Help "Wenzhou South Power Distribution" | Power Quality Management Expert - Yide Technology2018-07-28

Help "Wenzhou South Power Distribution" | Power Quality Management Expert - Yide Technology

SPC Tangshan City Fengnan District Public Change - Site One
SPC Tangshan City Fengnan District Public Change - Site One2018-07-26

The transformer is a public transformer with a capacity of 315KVA. The load is mainly for residential electricity, single-phase load such as lighting, air conditioning, heating, etc., and there is a long-term three-phase load imbalance.

Chain factory SVG reactive compensation
Chain factory SVG reactive compensation2018-07-28

Chain factory SVG reactive power compensation comprehensive solution

 State Grid Chengbu Power Supply Branch Typical experience of three-phase unbalance adjustment
State Grid Chengbu Power Supply Branch Typical experience of three-phase unbalance adjustment2018-07-28

The three-phase voltage source of a three-phase balanced circuit must be a sine wave with the same frequency, the same amplitude, and 120 degrees difference in phase; the three-phase load impedance is the same and both are linear impedances, so the three-phase currents are all sine waves. And the frequency is the same, the amplitude is the same, and the phases are 120 degrees out of each other. Absolute three-phase balance does not exist, and the actual three-phase system always has different degrees of imbalance. The grid hopes that the three-phase current of the user load will be balanced as much as possible. Otherwise, the three-phase unbalanced current will cause the transformer capacity to be wasted and the neutral current to be too large. The grid hopes that the reactive current of the user load is as small as possible, otherwise the reactive power is in the grid. Circulating back and forth with the load, resulting in wasted power; the grid hopes that the harmonic current of the user load is as small as possible, otherwise the harmonics will cause the grid voltage and current to be distorted, causing the equipment to work abnormally; the user wants the voltage amplitude provided by the grid to be more stable. Well, otherwise too high or too low voltage will cause equipment protection or even damage.

TSCL Getrag (Jiangxi) Transmission System Co., Ltd.
TSCL Getrag (Jiangxi) Transmission System Co., Ltd.2018-07-28

Getrag (Jiangxi) Transmission System Co., Ltd. Zhangzhou Economic and Technological Development Division is one of the factories under the jurisdiction of Getrag (Jiangxi) Transmission Systems Co., Ltd. It is located at No. 38 Yingbin Avenue, Zhangzhou Development Zone, Jiangxi Province, with a total area of 360.5 mu and a total investment of 1.466 billion yuan. The plant area is currently 81,966 square meters, the office building is 3,627 square meters, and the logistics warehouse is 8064 square meters. The factory has about 1,300 employees, including about 300 engineers and technicians.

Mitsubishi forged APF renovation site
Mitsubishi forged APF renovation site2018-07-28

It is characterized by very large load fluctuations, rapid changes in current speed, and large harmonic content. This problem directly affects the overall power quality of the production plant.

浙江时时彩11选五 黑龙江11选五一定牛结果 白小姐精选三肖中特 浙江快乐12历史开奖结果 甘肃十一选五任五走势图 广东十一选五官方网站 乐普医疗股票吧 三板股票推荐 快乐10分在线预测 高手分享快三豹子技巧 东方能源股票趋势 10月14日上证指数 内蒙古十一选五开奖查 排列三计划软件 magnet 猪肉股票走势 如何看股票投资开户 甘肃泳坛夺金走势图